Project Engineer for
upgrading lift station no. 22 including wet well and pumps,
design of forcemains for two different alternatives, and
preliminary evaluations for upgrading lift stations nos. 12, 19,
13, 15, 33, 43, 46.
South Bay Interconnecting
Sewer Disposal Line to Belle Glade WWTP, City of South Bay, FL
Assisted Conceptual Waste
Water Disposal Corrective Program Report. Prepared Drawings and
Project Manual, coordinated bidding, and conducted the
Construction Administration for Interconnecting Sewer Disposal
Line to Belle Glade Waste Water Treatment Plant, including
replacing / repairing of pumps at South Bay WWTP Effluent Pump
Station.
Water Management
Northern Palm Beach
County Improvement District UOD No. 19A, Palm Beach County, FL.
Irrigation System Study and Design
Prepared preliminary and final Irrigation system model using
WaterCAD, coordinated project drawings, and prepared Bid
Documents and Specifications.
Assisted the design of box-culverts for five different
locations, drawings, bid documents and specifications, and
estimates of probable construction cost.
Facilities
Central County Transfer
Station Improvements - Landscape Phase I, Palm Beach County, FL
Provided on-site services
during construction. Duties included reviewing contractor’s
progress and payments schedules, attended progress meetings and
job conferences. Inspected work to insure compliance with
contract documents and providing documentation of daily job-site
activities. Prepared bid documents and specifications.
Commercial Materials
Recovery Facility (CMRF) Expansion and Improvements, Palm Beach
County, FL
Provided on-site field
engineering and inspection services.
Woody Waste Mobile
Office Building, Palm Beach County, FL
Provided on-site field
engineering and inspection services.
Woody Waste Water
Supply, Palm Beach County, FL
Provided on-site field
engineering and inspection services.
Central County Transfer
Station Improvements - Phase II, Palm Beach County, FL
Coordinated Civil and
Structural Conformed Drawings and Specifications, and reviewed
utilities shop drawings and utilities Record Drawings.
South County Transfer
Station Phase 2 Site Improvements, Palm Beach County, FL
Designed water service,
and assisted site, storm water and utilities drawings, Bid
Documents, Specifications, and cost estimates. Project Manager
for Construction Administration Services.
Household Hazardous
Waste Collection Facility, Palm Beach County, FL
Prepared Bid Documents and
Specifications, provided on-site field engineering and
inspection services, and reviewed utilities shop drawings and
utilities Record Drawings.
Landfill Inbound and
Outbound Scales Replacement, Palm Beach County, FL
Provided on-site field
engineering and inspection services.
SWA Bi Annual
Facilities Inspection
Site inspections on Civil
and Environmental issues.
Cooley Court, Palm
Beach County, FL
SWA Trailway System at
Jog Road Site
CDM – Palm Beach
County. Sand Drying Beds Study
Prepared Conceptual Design
and Cost Estimate for adding a Sand Drying Bed Facility at East
Central Regional Waste Water Treatment Facility (ECRWTF).
CDM – SFWMD.
Feasibility of Reclaimed Water for Augmentation of Water
Supplies and Enhancement of Natural Systems in the Lower East
Coast Water Supply Planning Area
Participated in data
Collection for Evaluation of Feasibility of Reclaimed Water for
Augmentation of Water Supplies and Natural Systems under the
Current Regulatory Framework.
CDM – SFWMD Alternative
Water Resources Feasibility Study
Participated in the
preparation of report for Reclaimed Water, Tertiary Treatment of
Secondary Effluent at existing Waste Water Treatment Plants and
Ocean Outfalls, and Reclaimed Water, Satellite Production
Facilities (i.e., Membrane BioReactors) for Sunrise, Fort
Lauderdale and Miami-Dade County.
SFWMD – Revision of
SFWMD CAD Standard Guidelines Plans
Responsible for the
drawing coordination and for the quality control.
Other
INGEVAL LTDA
(Colombia)
As Project Manager he was
responsible for engineering, environment and appraisal studies,
designs and inspection of: water and sewer systems, roads,
cadastral studies and of the appraisement, urban zoning and
territorial planning, construction of a five stories building,
and consulting the construction of a hospital. Headed the design
and construction program of the first nine centers of cellular
telephones in the Eastern Region of Colombia.
City of Los Patios
(Colombia)
Project Manager of the whole Water Municipal System (Supply,
Storage, Treatment and Distribution). Due the success was
awarded as “Meritorious Citizenship” of the Town.
FFDU-Financial Fund of Urban Development
(Bogota and Bucaramanga, Colombia)
As Project Supervisor and later as Regional Coordinator, he was
responsible for identifying, assisting, negotiating,
supervising, and managing major public projects in Colombia. His
duties included preparing and conducting technical, economical
and financial project evaluations.
FFDU/Inter-American Development Bank
(Colombia)
He was responsible for the
countrywide supervision of bidding and construction of projects
financed by the Inter-American Development Bank (IDB).
EMPOSAN-Company of Sanitary Utilities of
Santander (Bucaramanga,
Colombia)
Projects Coordinator for projects financed by the FFDU. Duties
included revising and adjusting final designs, justifying about
forty water and sewer projects, and their coordination,
execution, and inspection.
Independent
Contractor
Contractor of civil works including:
buildings and water and sewer systems.
HIDROESTUDIOS LTDA (Bucaramanga,
Colombia )
As Design Engineer prepared
designs for: sewer, fluvial erosion control and hydraulic
structures, drainages, and slopes stabilization.
|