Home

About Us

Services

Projects

Locations

Contact Us

Employee Only

 

 

Biography - Jose C. Huertas, P.E.

Civil Engineer

Education:

1977 - B.S. -Civil Engineering, Universidad Industrial de Santander. Bucaramanga - Colombia
1979 - Fluvial Erosion Control Practice at Laboratorio Nacional de Engenharia Civil (LNEC) and Soil Mechanics Course at Universidade Nova de Lisboa, Lisbon - Portugal                                                                                          1998 - Specialist in Environmental Management“, Universidad Pontificia Bolivariana. Bucaramanga - Colombia


Professional Organizations:

Professional Registrations:


Florida Water Environment Association
 

State of Florida, License #61711
 

Mr. Huertas has twenty-eight years of experience in civil engineering. He has extensive background as a consultant and in coordinating construction project scheduling and phase work, and in pursuing, controlling, and supervising drafts, reports, and final designs.                                                            Mr. Huertas also has experience in MSOffice (Word, Excel, Power Point), WaterCAD, and the Internet.


Professional Experience:

 

Palm Beach Gardens High School ReplacementProject Engineer for Civil, water, fire, and sewer utilities for replacement of existing 2,650 students facility. Civil site improvements include demolition of existing facilities, storm water design including exfiltration trenches, new internal road and entrances, new parking lots, bus loop, fencing, side walks, sewer, fire and water utilities.

Wastewater Collection and Pumping

LS #22 and Force Mains Improvements, City of Riviera Beach Utility District, FL

Project Engineer for upgrading lift station no. 22 including wet well and pumps, design of forcemains for two different alternatives, and preliminary evaluations for upgrading lift stations nos. 12, 19, 13, 15, 33, 43, 46. 

South Bay Interconnecting Sewer Disposal Line to Belle Glade WWTP, City of South Bay, FL

Assisted Conceptual Waste Water Disposal Corrective Program Report. Prepared Drawings and Project Manual, coordinated bidding, and conducted the Construction Administration for Interconnecting Sewer Disposal Line to Belle Glade Waste Water Treatment Plant, including replacing / repairing of pumps at South Bay WWTP Effluent Pump Station. 

Water Management

Northern Palm Beach County Improvement District UOD No. 19A, Palm Beach County, FL. Irrigation System Study and Design

Prepared preliminary and final Irrigation system model using WaterCAD, coordinated project drawings, and prepared Bid Documents and Specifications. 

Landfill Central Culvert System, Palm Beach County, FL

Assisted the design of box-culverts for five different locations, drawings, bid documents and specifications, and estimates of probable construction cost. 

Facilities

Central County Transfer Station Improvements - Landscape Phase I, Palm Beach County, FL

Provided on-site services during construction. Duties included reviewing contractor’s progress and payments schedules, attended progress meetings and job conferences. Inspected work to insure compliance with contract documents and providing documentation of daily job-site activities. Prepared bid documents and specifications. 

Commercial Materials Recovery Facility (CMRF) Expansion and Improvements, Palm Beach County, FL

Provided on-site field engineering and inspection services. 

Woody Waste Mobile Office Building, Palm Beach County, FL

Provided on-site field engineering and inspection services.

Woody Waste Water Supply, Palm Beach County, FL

Provided on-site field engineering and inspection services. 

Central County Transfer Station Improvements - Phase II, Palm Beach County, FL

Coordinated Civil and Structural Conformed Drawings and Specifications, and reviewed utilities shop drawings and utilities Record Drawings. 

South County Transfer Station Phase 2 Site Improvements, Palm Beach County, FL

Designed water service, and assisted site, storm water and utilities drawings, Bid Documents, Specifications, and cost estimates. Project Manager for Construction Administration Services. 

Household Hazardous Waste Collection Facility, Palm Beach County, FL

Prepared Bid Documents and Specifications, provided on-site field engineering and inspection services, and reviewed utilities shop drawings and utilities Record Drawings. 

Landfill Inbound and Outbound Scales Replacement, Palm Beach County, FL

Provided on-site field engineering and inspection services. 

SWA Bi Annual Facilities Inspection

Site inspections on Civil and Environmental issues.

Hazen & Sawyer - Palm Beach County. Winsberg Farm Wetlands Natural Park.

Provided on-site field engineering and inspection services for Civil and Utilities Work. 

Roadway

Cooley Court, Palm Beach County, FL

Prepared the 100% submittal of drawings. 

South Bay Roadway Improvement

Improved ten streets identified by Office of Community revitalization and coordinate with the PBC Road and Bridge Division in preparation of the reconstruction plan.  Also, prepared cross section drawings, technical criteria, and permit applications with SFWMD. 

SWA Trailway System at Jog Road Site

Participated in Preliminary Study Report and Master Plan Report. Engineer of Record for the Civil design for the 3-mile pedestrian foot trail, multiuse trails and boardwalks creating an ecological pathway for the public. Permitting pending. 

Environmental

CDM – Palm Beach County. Sand Drying Beds Study

Prepared Conceptual Design and Cost Estimate for adding a Sand Drying Bed Facility at East Central Regional Waste Water Treatment Facility (ECRWTF). 

CDM – SFWMD. Feasibility of Reclaimed Water for Augmentation of Water Supplies and Enhancement of Natural Systems in the Lower East Coast Water Supply Planning Area

Participated in data Collection for Evaluation of Feasibility of Reclaimed Water for Augmentation of Water Supplies and Natural Systems under the Current Regulatory Framework. 

CDM – SFWMD Alternative Water Resources Feasibility Study

Participated in the preparation of report for Reclaimed Water, Tertiary Treatment of Secondary Effluent at existing Waste Water Treatment Plants and Ocean Outfalls, and Reclaimed Water, Satellite Production Facilities (i.e., Membrane BioReactors) for Sunrise, Fort Lauderdale and Miami-Dade County. 

SFWMD – Revision of SFWMD CAD Standard Guidelines Plans

Responsible for the drawing coordination and for the quality control. 

Other 

INGEVAL LTDA (Colombia)                                          

As Project Manager he was responsible for engineering, environment and appraisal studies, designs and inspection of: water and sewer systems, roads, cadastral studies and of the appraisement, urban zoning and territorial planning, construction of a five stories building, and consulting the construction of a hospital. Headed the design and construction program of the first nine centers of cellular telephones in the Eastern Region of Colombia. 

City of Los Patios (Colombia)

Project Manager of the whole Water Municipal System (Supply, Storage, Treatment and Distribution). Due the success was awarded as “Meritorious Citizenship” of the Town. 

FFDU-Financial Fund of Urban Development (Bogota and Bucaramanga, Colombia)

As Project Supervisor and later as Regional Coordinator, he was responsible for identifying, assisting, negotiating, supervising, and managing major public projects in Colombia. His duties included preparing and conducting technical, economical and financial project evaluations. 

FFDU/Inter-American Development Bank (Colombia)

He was responsible for the countrywide supervision of bidding and construction of projects financed by the Inter-American Development Bank (IDB).  

EMPOSAN-Company of Sanitary Utilities of Santander (Bucaramanga, Colombia)                    

Projects Coordinator for projects financed by the FFDU. Duties included revising and adjusting final designs, justifying about forty water and sewer projects, and their coordination, execution, and inspection.  

Independent Contractor                                                                                                             Contractor of civil works including: buildings and water and sewer systems. 

HIDROESTUDIOS LTDA (Bucaramanga, Colombia )

As Design Engineer prepared designs for: sewer, fluvial erosion control and hydraulic structures, drainages, and slopes stabilization.